How to Set the Schedule Start and Finish Date
- Open your schedule and navigate to Setup in the left side panel, then click Settings.
- Review the Start date field — this reflects the date chosen when the schedule was created.
- Review the Finish date field — this also reflects the date set during schedule creation.
- Update the Start date by typing a new date directly into the field, or click the calendar icon to pick a date.
- Update the Finish date the same way — type a date or use the calendar icon.
- Navigate to Takt Time, Flowline, or Gantt to verify that the Project start and Project finish markers are displayed correctly as vertical yellow lines.
Note: The start and finish dates define the visible project boundaries across all scheduling views (Takt Time, Flowline, and Gantt).
Tactplan Schedule - Plans_Setup - Settings (2.4.0)